Project Title Global Search Tool
Duration April 09 – till date
Software’s Used Lua Script,Windows,
Client Ericsson, Sweden.
Team size 4
Role Team Member
Activities Responsible for Maintenance of GST on Intranet
Estimation and High level Design specification for Enhancement.
Coding and Testing.
Project Title Akamai configuration
Duration Jan 09 – till date
Software’s Used Perl,C,C++,Solaris
Client Ericsson, Sweden.
Team size 1
Role Team Member
Activities Responsible for Maintenance of pages on Intranet/internet/extranet.
Estimation and High level Design specification for Enhancement.
Coding and Testing.
Description The requirement was to configure the log delivery on net storage and default page during failover.TTL setting for ericsson site. Currently implementing archiving process on akamai on net storage.
Project Title WebTrends Analytics 8.0a
Duration July 08 – till date
Software’s Used Perl,C,C++,Solaris
Client Ericsson, Sweden.
Team size 1
Role Team Member
Activities Responsible for Maintenance of Application
Estimation and High level Design specification for Enhancement.
Coding and Testing.
Description The requirement was to develop Web analysis using log to generate reports for Number of visitors and the location of visitors. It fetches the log from Akamai Edge server and generates the required report.
Project Title EMV CREDIT-DEBIT APPLICATION
Duration April 08 – June 08
Software’s Used C/C++, Windows and NURIT IDE
Client Venture Infotek, India.
Team size 4
Role Team Member
Activities Coding and Testing.
Project Execution and Responsible for the Design and Coding of Software.
Description The requirement was to Develop POS application ( EMV Credit Debit Application) which can support different transaction using those Magnetic card and smart Card.
• Sale
• Void
• Adjust
• Refund
• Settlement
The transaction will use modem communication media. The packet sent by the terminal must follow the ISO 8583 packet format.The application first develop for LIPMAN 8320(verifone) and will port to Axalato
Project Title Citi Financial PL Application
Duration June 07 – June 08
Software’s Used C/C++, Windows and ODT
Client Hypercom, USA.
Team size 2
Role Team Member
Activities Coding and Testing.
Project Execution and Responsible for the Design and Coding of Software.
Description The requirement was to Develop POS application for Citi-Financial which can support different transaction using those PL- Card.
• Sale
• Void
• Adjust
• Gift transaction(Sale, Redeem and Balance Enquiry)
• Compute Financing
The application will support the multi- merchant transaction and it include different message packet for different host like (MCON, PAYMENTECH,EMERGIS,TNSI,PNS ISO,BBR). It support six host which is having different message packet.
Project Title BNU MACAU
Duration Feb 07 – May 07
Software’s Used C/C++, Windows and ODT
Client Hypercom Asia Ltd.
Team size 1
Role Team Member
Activities Coding and Testing.
Project Execution and Responsible for the Design and Coding of Software.
Description The requirement was to implement POS application for JETCO debit support on T42xx.
Balance Inquiry Transaction for JETCO.
Debit Transaction for JETCO.
Void Transaction for JETCO.
This Jetco debit transaction uses track 3 info for these transaction. The packet sent by the terminal must follow the ISO 8583 packet format.
Project Title PROSA MEXICO
Duration Dec 06 – Feb 07
Software’s Used C/C++, Windows and ODT
Client Hypercom, USA.
Team size 1
Role Team Member
Activities Coding and Testing.
Project Execution and Responsible for the Design and Coding of Software.
Description The requirement was to Port the POS application from EFTOS to Nucleus OS. This code will support for both (Ethernet and modem mode) communication media. The packet sent by the terminal must follow the ISO 8583 packet format. Application will support different type of transaction like Sale, Authorization, Adjust, void, Batch settlement etc.
Project Title Telephone Application Protocol Interface
Duration July 05 – Nov 06
Software’s Used C++, Linux
Team size 4
Role Team Member
Activities Coding and Testing.
Project Execution and Responsible for the Design of hardware and Coding of System Software.
Description The requirement was to develop an API function. Using this API we can manage Call system. We have to establish a session between the two User Agent and SIP protocol(RFC3261) is used for that purpose.
Project Title Hardware Locking System (Dongle)
Duration Nov 05- June 06
Software’s Used C, Linux
Client Webcom , India
Team size 2
Role Team Member
Activities Requirement analysis, Data collection and System study.
Low level and High level Designing
Coding and Testing.
Project Execution and Responsible for the Design of hardware and Coding of System Software.
Description The requirement was to develop a Hardware lock for LPT1 port and a program which can periodically check whether proper dongle is present if not stop executing . When you install this program it adds a device driver that talks to the dongle.
Project Title
Wireless mailing system
Duration May 05 – Oct 05
Languages/ Tools C
OS Linux
Team size 2
Client Webcom , India
Role Team Member
Activities Requirement analysis, Data collection and System study.
Low level and High level Designing
Coding and Testing.
Project Execution and Responsible for the Design of hardware and Coding of System Software.
Description The requirement was to Connect the two PC without any cable through IR medium. This project uses IR transmitter and receiver, which are connected with the PC interface card . PC interface card contain PIC16F84 and 8255.
Project Title
Message Accounting Terminal (MAT)
Duration Dec 04 – April 05
Languages/ Tools C
OS Linux
Team size 2
Client Webcom , India
Role Team Member
Activities Responsible for the client server module(Socket,TCP/IP), Prepare the work Product document. Coding & unit testing.
Description Message Terminal Software is designed to work as formatted terminal for telegram message transmission and reception. This terminal is completely menu driven. The operator can create new message, edit message and can change setting of the system. The accounting software is also embedded in this project.